Lower losses than the S11 economy series, plus the type test and energy efficiency reports a utility or EPC specification will ask you to submit.
The hardware is still a copper-wound oil-immersed distribution transformer. What changes is the loss level, the accessory set, and the documentation pack — which is usually what decides whether a bid is technically compliant.
If your tender quotes IEC 60076, send us the clause list. We will tell you which items our national-laboratory reports cover and where a project-specific type test would be needed.
| Term | Detail |
|---|---|
| MOQ | 10 units per order |
| Lead time | Quoted per order; longer than the S11 economy series |
| Price | Quoted above the published S11 list |
| Documentation | Type test and efficiency reports, drawings, routine records |
| Payment | T/T 30% deposit, 70% before shipment; L/C at sight for tenders |
| Document | Purpose |
|---|---|
| Type test report | Proves the design, submitted with the bid |
| Energy efficiency report | Supports the loss figures in the tender schedule |
| General arrangement drawing | Foundation, clearance and cable entry planning |
| Routine test record | Per unit, issued with the shipment |
| English nameplate and manual | Site installation and inspection |
We will answer against your clause list, and tell you which reports we already hold and which would need a project-specific test.