Factory-direct distribution transformers & substations · Anqing, Anhui, China
WhatsApp & email: david@hengyuanpower.com · +86 187 5568 0508
Home › Pricing

Distribution transformer prices, published

S11 three-phase, 11 kV, 50 to 2500 kVA, full copper windings. Ex-works prices in USD, updated with the copper market. Most factories make you ask; we would rather you compare us on numbers.

Three ways to buy

Pick the tier that matches the project, not only the price

The price list below is our Economy series. Most buyers start there, and move up a tier when the tender specifies losses, documentation or a drawing.

Economy

S11 series

Standard configuration, full copper windings, published prices. The fastest route to a container.

  • Best for: distributors and importers selling standard ratings
  • Losses: standard
  • Documents: routine test record and drawing
  • Price: the published list below
  • Economy series details →
Standard export

S13 / S20 series

Lower losses and export documentation, for tenders that grade both.

  • Best for: utility tenders and EPC projects
  • Losses: lower than S11
  • Documents: type test and energy efficiency reports included
  • Price: above the S11 list, quoted per order
  • Standard export details →
Custom / OEM

Built to your drawing

Any voltage combination, impedance, vector group, climate or enclosure — under your brand.

  • Best for: project specifications and private label
  • Losses: to your specification
  • Documents: full project documentation
  • Price: quoted against drawings
  • Custom / OEM details →
Economy (S11)Standard (S13 / S20)Custom / OEM
WindingFull copperFull copperCopper or aluminium, to specification
LossesStandardLowerTo specification
AccessoriesStandard setExport setPer drawing
DocumentsRoutine test record, drawingPlus type test and efficiency reportsFull project documentation
BrandingOur nameplate, or yoursYour nameplateYour brand, manual and packing
PricePublished listQuoted, above S11Quoted per drawing

What the price includes

  • S11 series, three-phase, oil-immersed, corrugated sealed tank
  • Full copper windings — not aluminium
  • Primary 11 kV; secondary 0.4, 0.415 or 0.433 kV
  • Dyn11 vector group, 50 Hz, ONAN cooling, standard accessories
  • Routine test on every unit, with the test record supplied

Ex-works Anqing, China. Packing, inland transport, export documentation and freight are quoted separately. FOB Shanghai or Ningbo on request.

Commercial terms

TermDetail
MOQ10 units per order, mixed ratings accepted
Lead time30 – 45 days after deposit
Price basisEx-works, USD
Copper clauseEvery USD 1,600 / t move in copper changes these prices by about 5.5%
PaymentT/T: 30% deposit, 70% before shipment. L/C at sight for tender orders.
BrandingOEM / ODM: nameplate, logo, manual and packing to your brand

S11 price list, 11 kV

Ex-works price in USD per unit. All ratings are available at 11/0.4, 11/0.415 or 11/0.433 kV.

CapacityEx-works price (USD)Secondary voltage options
50 kVA1,82111/0.4 · 11/0.415 · 11/0.433
80 kVA2,36411/0.4 · 11/0.415 · 11/0.433
100 kVA2,65811/0.4 · 11/0.415 · 11/0.433
160 kVA3,44511/0.4 · 11/0.415 · 11/0.433
200 kVA3,95911/0.4 · 11/0.415 · 11/0.433
250 kVA4,58411/0.4 · 11/0.415 · 11/0.433
315 kVA5,36711/0.4 · 11/0.415 · 11/0.433
400 kVA6,46811/0.4 · 11/0.415 · 11/0.433
500 kVA7,43711/0.4 · 11/0.415 · 11/0.433
630 kVA9,09611/0.4 · 11/0.415 · 11/0.433
800 kVA10,94911/0.4 · 11/0.415 · 11/0.433
1000 kVA12,23111/0.4 · 11/0.415 · 11/0.433
1250 kVA14,34411/0.4 · 11/0.415 · 11/0.433
1600 kVA17,74811/0.4 · 11/0.415 · 11/0.433
2000 kVA19,94211/0.4 · 11/0.415 · 11/0.433
2500 kVA25,50211/0.4 · 11/0.415 · 11/0.433

Prices are indicative and confirmed at order date against the copper price. Copper movement of USD 1,600 per tonne adjusts these prices by approximately 5.5%.

What moves the price

Upgrades that add cost

  • Higher energy efficiency: S13, S20 or S22 instead of S11
  • ONAF cooling instead of ONAN
  • On-load tap changer instead of off-circuit
  • Higher IP enclosure, cable box, temperature control
  • Design for high altitude, high ambient or seismic area

Where the saving comes from

Two things make a transformer cheap: the winding material and the margin chain. A lot of low-price offers use aluminium windings; ours are full copper. And you are buying from the factory, not through a trading company, so there is no second margin in the price.

If you receive a quote far below these numbers, ask what the windings are made of. That is usually the answer.

Ordering, OEM and delivery

1. Send the list

Ratings, quantities, secondary voltage and the destination port. A spreadsheet is fine.

2. Confirm the price

We re-check the copper price and issue a formal quotation with packing and freight options.

3. Production

30–45 days after deposit. Nameplates and manuals printed with your brand if you supply artwork.

Questions buyers ask first

QuestionAnswer
Ex-works or FOB?These are ex-works Anqing. FOB Shanghai or Ningbo quoted on request, including packing, inland transport and export documents.
Minimum order?10 units per order. Mixed ratings are accepted — normal when you are filling a container.
Lead time?30–45 days after the deposit, depending on the rating mix and quantity.
Copper or aluminium?Full copper as standard. Aluminium is available on request at a lower price, but we quote copper unless you ask otherwise.
Can you put our brand on it?Yes. Nameplate, logo, manual and packing marking. This is standard OEM/ODM production.
What documentation comes with it?Routine test record for each unit, drawing, English nameplate, and type test and energy efficiency reports for the series on request.

Send a list, get a container price

Give us the ratings and quantities and we will come back with a formal quotation, a packing plan and the loading quantity per 20GP or 40HQ.

Chat on WhatsApp