11kV/415V secondary substation: selection guide

A practical guide to choosing between a transformer-only scope and a complete packaged secondary substation, then specifying the equipment and documents needed for quotation.

Start with the scope

What does an 11kV/415V secondary substation include?

An 11kV/415V secondary substation receives power from an 11kV network and distributes it at 415V. The term can describe two different purchasing scopes, so clarify this before comparing prices.

Transformer-only scope

Includes the 11/0.415 kV distribution transformer and agreed accessories. The HV switchgear, LV panel, protection, building and installation are supplied separately.

Review the 11kV distribution transformer range

Packaged substation scope

Includes the HV switchgear, transformer, LV distribution, protection and enclosure as one coordinated package, prewired and tested before shipment.

Review European type packaged substations

Typical configuration

11kV/415V equipment scope

System elementWhat to specify
Transformer400-1250 kVA typical for packaged units; 50-2500 kVA for standalone range. Confirm 11/0.415 kV, vector group, impedance and losses.
HV switchingRing-main unit, circuit-breaker switchgear or project-specific arrangement; current rating, fault level and interlocks.
LV distributionMain incomer, busbar rating, metering and required number of outgoing feeders.
ProtectionTransformer protection, HV fault protection, LV outgoing protection and required metering or remote signalling.
EnclosureIndoor or outdoor installation, IP rating, ventilation, cable entry, maintenance access and transport dimensions.

A 415V network is often three-phase four-wire. Confirm local utility requirements for the neutral, earthing, vector group and fault rating before finalising the design.

How to choose the transformer rating

Start with calculated maximum demand, power factor and daily load profile rather than the existing transformer nameplate alone. Then check the utility standard, permissible loading and required spare capacity.

Compare total losses across the expected load profile, not only the initial purchase price. Specify the required Class-1 or Class-2 efficiency level where the tender or utility demands it.

Procurement checklist

ItemInformation required
Electrical system11kV system details, 415V arrangement, frequency, fault level and neutral earthing.
RatingTransformer kVA, future spare capacity, ambient temperature and altitude.
ConfigurationTransformer only or packaged; number of HV incomers/outgoings and LV feeders.
ProtectionRequired relays, CTs, metering, interlocks, alarms and remote signals.
SiteIndoor/outdoor, enclosure finish, cable entry, footprint and transport limits.
ApprovalApplicable IEC or utility specifications, drawings, type tests and routine tests.

Documents to request with the quotation

Electrical drawings

Single-line diagram, GA drawing, cable-entry layout and transformer data sheet.

Test evidence

Routine test scope for every unit and availability of type-test and efficiency reports for the offered series.

Delivery documents

Packing plan, lifting points, section dimensions, shipping split and installation instructions.

Compare substation and transformer layouts in the packaged versus conventional substation guide.

Send the electrical parameters

Provide the single-line diagram, transformer rating, LV feeders and site conditions for a coordinated technical and commercial proposal.