Factory-direct distribution transformers & substations · Anqing, Anhui, China
WhatsApp & email: david@hengyuanpower.com · +86 187 5568 0508
Home › Packaged substations › Selection guide

Packaged substation vs conventional substation

Compare factory-built packaged substations with conventional equipment rooms and site-assembled secondary distribution systems before choosing the project scope.

The main difference

Factory assembly versus separate site installation

Both arrangements can contain the same transformer, medium-voltage switchgear, low-voltage distribution and protection. The difference is how the equipment is housed, assembled, tested and delivered.

Packaged substation

The HV switchgear, transformer, LV board and protection are coordinated in one outdoor enclosure. Equipment is factory-wired, checked and prepared for shipment as a complete package.

View European type packaged substations

Conventional substation

The transformer, switchgear and LV panels are installed separately in a building or electrical room. Site interfaces, civil works, cabling and commissioning are coordinated as separate packages.

Side-by-side comparison

FactorPackaged substationConventional substation
Factory workHigher: layout, wiring, protection coordination and testing are prepared as one packageEquipment is normally tested separately; site integration is handled during construction
Site workPrepare foundation, connect incoming/outgoing cables and commissionMore civil, cabling, equipment installation and interface work
FootprintCompact compared with a dedicated equipment buildingDepends on building layout, access and clearances
MaintenanceAccess depends on compartment and door arrangementUsually more open access inside a fixed electrical room
TransportUnit or coordinated sections; dimensions must be checkedIndividual equipment can be shipped separately
Best fitOutdoor sites, industrial parks, renewable projects and compact footprintsExisting buildings, large bespoke layouts or separately procured equipment

When a packaged substation is usually the better choice

The 11kV/415V secondary substation guide explains the equipment scope and procurement checklist in detail.

When a conventional substation may be preferable

The labels are not universal procurement standards. The final arrangement must follow the local utility, fire, earthing and site requirements.

What to include in the RFQ

Electrical

HV voltage, transformer rating, LV voltage, fault level, vector group, impedance and number of feeders.

Site

Indoor/outdoor location, foundation, cable entry, ambient temperature, altitude, IP rating and available footprint.

Commercial

Required standard, approved drawings, test documents, shipping destination, quantity and expected delivery date.

Need a transformer as a separate unit? Compare the 11kV distribution transformer range and 33kV transformer range.

Compare the project scope

Send the single-line diagram, layout constraints and required electrical ratings. We will clarify whether a packaged or conventional arrangement is more suitable.