Compare factory-built packaged substations with conventional equipment rooms and site-assembled secondary distribution systems before choosing the project scope.
Both arrangements can contain the same transformer, medium-voltage switchgear, low-voltage distribution and protection. The difference is how the equipment is housed, assembled, tested and delivered.
The HV switchgear, transformer, LV board and protection are coordinated in one outdoor enclosure. Equipment is factory-wired, checked and prepared for shipment as a complete package.
The transformer, switchgear and LV panels are installed separately in a building or electrical room. Site interfaces, civil works, cabling and commissioning are coordinated as separate packages.
| Factor | Packaged substation | Conventional substation |
|---|---|---|
| Factory work | Higher: layout, wiring, protection coordination and testing are prepared as one package | Equipment is normally tested separately; site integration is handled during construction |
| Site work | Prepare foundation, connect incoming/outgoing cables and commission | More civil, cabling, equipment installation and interface work |
| Footprint | Compact compared with a dedicated equipment building | Depends on building layout, access and clearances |
| Maintenance | Access depends on compartment and door arrangement | Usually more open access inside a fixed electrical room |
| Transport | Unit or coordinated sections; dimensions must be checked | Individual equipment can be shipped separately |
| Best fit | Outdoor sites, industrial parks, renewable projects and compact footprints | Existing buildings, large bespoke layouts or separately procured equipment |
The 11kV/415V secondary substation guide explains the equipment scope and procurement checklist in detail.
The labels are not universal procurement standards. The final arrangement must follow the local utility, fire, earthing and site requirements.
HV voltage, transformer rating, LV voltage, fault level, vector group, impedance and number of feeders.
Indoor/outdoor location, foundation, cable entry, ambient temperature, altitude, IP rating and available footprint.
Required standard, approved drawings, test documents, shipping destination, quantity and expected delivery date.
Need a transformer as a separate unit? Compare the 11kV distribution transformer range and 33kV transformer range.
Send the single-line diagram, layout constraints and required electrical ratings. We will clarify whether a packaged or conventional arrangement is more suitable.